CF1760048046565-tsm20251009080619

IPLIST.NET - www.platformsproject.com

Search for IP or hostnames:

www.platformsproject.com checked at 2025-10-09T22:14:06.523Z 458ms 84/84/84 100% R:15

www.platformsproject.com

CNAMEplatformsproject.com
MXmail.platformsproject.com
A2a00:1c98:1010:1::97 🇧🇪 Combell
PTRlinux2727.grserver.gr
A213.158.90.162🇮🇹 Combell
PTRlinux2727.grserver.gr
NSns155.grserver.gr
A2a00:1c98:1010:1::97 🇧🇪 Combell
PTRlinux2727.grserver.gr
A213.158.90.162🇮🇹 Combell
PTRlinux2727.grserver.gr
NSns156.grserver.gr
A2a00:1c98:1010:1::97 🇧🇪 Combell
PTRlinux2727.grserver.gr
A213.158.90.162🇮🇹 Combell
PTRlinux2727.grserver.gr
A2a00:1c98:1010:1::97 🇧🇪 Combell
PTRlinux2727.grserver.gr
A213.158.90.162🇮🇹 Combell
PTRlinux2727.grserver.gr

platformsproject.com

MXmail.platformsproject.com
NSns155.grserver.gr
NSns156.grserver.gr
A2a00:1c98:1010:1::97 🇧🇪 Combell
A213.158.90.162🇮🇹 Combell

Starts with same word

Starts similarily

AI analysis

www.platformsproject.com points to two IP numbers: 2a00:1c98:1010:1::97 and 213.158.90.162.

Other host names such as mail.linuxzone78.grserver.gr, mail.paixto.gr, mail.irinikalaitzidi.com, linux2727.grserver.gr and gps.gr share IPs with www.platformsproject.com.

www.platformsproject.com is delegated to two name servers: ns155.grserver.gr and ns156.grserver.gr.

www.platformsproject.com shares the same name server setup as mouglalis.gr, vapeport.gr, transcar.gr, akdesign.gr and alexandrabissa.com.

Host names with two IP numbers:

ns155.grserver.gr points to 2a00:1c98:1010:1::97 and 213.158.90.162.

ns156.grserver.gr points to 2a00:1c98:1010:1::97 and 213.158.90.162.

Host names pointing to 2a00:1c98:1010:1::97: ns155.grserver.gr and ns156.grserver.gr.

Host names pointing to 213.158.90.162: ns155.grserver.gr and ns156.grserver.gr.

www.platformsproject.com is handled by a single mail server, mail.platformsproject.com.

The mail server setup for www.platformsproject.com mirrors that of other domains, for instance platformsproject.com.

mail.platformsproject.com points to two IPs: 2a00:1c98:1010:1::97 and 213.158.90.162.

Perform reverse DNS lookup as well as normal forward DNS. Check Autonomous System Numbers (ASNs) and BGP connections between Internet Service Providers.
dbq

HfGciWG CF johedugfp 2025-10-09